Construction of the Saemangeum Bridge in South Korea is making progress!
From January 2023 we will start the prestressing and finishing works, including the dampers.
As a reminder, the bridge is located on the coast of the Yellow Sea in South Korea. The concrete cable-stayed bridge is built with a main span of 770m.
Did you know that this is the first time in the history of cable-stayed bridges that 2160 MPa steel strands are used? All the components of our stay cable system have been re-engineered for this new use, which pushes performance further.
Discover or rediscover our complete case study on Saemangeum bridge’s ultra strong cables