Bridge and deck construction

Learn more

Discover some projects

Build
Australia

Adelaïde Superway erected with a launching gantry

Connecting north and south Adelaïde, the South Road Superway includes a 2.8-km elevated roadway. Freyssinet proposed the balanced cantilever erection with launching gantry as the most beneficial construction method.
Build
France

Allonne bridge construction by rotation

Installation of a cable-stayed bridge by rotation over a heavily trafficked motorway whose configuration does not allow for a traditional incremental launching construction method.
Build
Turkey

Çayırköy viaduct incremental launching

While incremental launching was the most appropriate method to construct the viaduct, it required complete rethinking to adapt to the project’s unusual configuration.
Build
Vietnam

Cua Dai extradosed bridge using Cohestrand technology

Locally-cohesive Cohestrand technology was successfully produced and installed for the first time on an extradosed highway bridge which crosses the Tra Khuc River to create a coastal bypass of Quang Ngai city.
Build
South Korea

Geoga cable-stayed bridge

Located in an exposed offshore area subject to high-speed winds and to potential typhoons, the cable-stayed bridge had to be equipped with the most robust cable anti-vibration system and durable stay cables.
Build
Indonesia

Jakarta LRT seismic isolated superstructure

Space for a new elevated light rail system in the capital was in short supply. Freyssinet’s proposal to introduce a seismic isolated superstructure addressed this and even led to a 20 % reduction in costs.

Building construction

Learn more

Discover some projects

Build
France

CNIT underground station jacking

The construction of a station located underneath a Paris shopping centre required the taking up of a load of a frame assembly of some 100,000 tonnes, thanks to an innovative jacking system.
BUILD
United Kingdom

Library of Birmingham, PT slabs rather than steel frame

Construction of the library of Birmingham was originally conceived as a structural steel frame. During the tender period, and in order to realise the full value engineering benefits, the frame was changed to reinforced concrete with post-tensioned slabs and beams
Build
France

The MUCEM pushes back post-tensioning limits

A complex and innovative system for casting, assembling and post-tensioning tree-shaped concrete columns was the key to bringing to life the architect’s vision for a new national museum in Marseille

Energy infrastructure construction

Learn more

Discover our projects

Water infrastructures construction

Learn more

Contact us

You have a question about our solutions or you already have a project in mind? Please fill out the form below and our teams will get back to you shortly.